The Snapshots in Time Collection
Destroyed Steel Truss Bridge with Temporary Engineer-Built Wooden Bypass, Germany
The twisted wreckage of a demolished steel bridge lies in the water beside a hastily constructed wooden bypass, evidence of the scorched-earth tactics German forces used to slow the Allied advance in 1944-1945. Combat engineers quickly rebuilt crossings like this one to keep troops, vehicles, and supplies moving toward the front. Project: 218246